Bluff council continues to work to provide aid to community
Members of the Bluff town council worked on establishing a local business relief grant program at their latest meeting on November 17.
In addition to a standard page where flood resource information is available. The town is also working to offer a business relief program
Town Manager Erin Nielson presented a survey for businesses to share impacts of both physical property damage and secondary economic losses caused by the flooding of the San Juan river.
Council is evaluating a relief allocation of approximately $77,000 in grants for local businesses. That number is 10-percent of the Bluff’s prior-year unrestricted fund balance which is the maximum the city can offer through such a program following state audit requirements.
Grant applications will be gathered and reviewed by council ahead of a formal vote scheduled for their first meeting in December.
At the same time staff shared that the residential assistance program is advancing. With outreach taking place with those homeowners most impacted. The town is actively processing reimbursement requests.
Staff and council also shared they are working aggressively to access federal funding. Mayor Josh Ewing shared an update on work to qualify Bluff for a Small Business Administration disaster program. Representatives from SBA were scheduled to conduct an on-site evaluation of Bluff this week. The program requires at least 25 regional properties with 40-percent or more uninsured losses. It was noted that some bureaucratic issues including whether properties on the reservation qualify or not could impact eligibility.
Council Member Britt Hornsby is also coordinating with the USDA Farm Service Agency (FSA) to secure relief for affected local agricultural operations.
To protect against future storm damage Mayor Ewing also shared efforts to request the Natural Resources Conservation Service (NRCS) for Bluff to participate in the Emergency Watershed Protection (EWP) program.
The EWP program can cover up to 75% of design and construction costs for flood control measures—such as protective berms—requiring a 25% non-federal match.
Additionally, town officials plan to seek state funding for a camera-based monitoring gauge along Cottonwood Wash at the Highway 95 bridge to overcome local cell coverage dead zones and provide early flood warnings.
Council also discussed road damage in the area. Council and staff confirmed that work is underway to construct a bypass around the damaged Comb Wash bridge on highway 163. It was also shared that local traffic is permitted to access the airport and old highway, but with much of Butler Wash Road washed-out residents are discouraged from attempting to go into Butler Wash.
Staff also shared work being done to evaluate and repair town roads including on Sagebrush, 2nd East and other local drainage ditches.
Town council also made plans to formally request the US Postal Service establish a temporary operating facility within Bluff while the office is closed. At the moment Bluff residents are required to drive to Blanding to receive their mail.
